Since the post holes (in the metal and concrete foundation) are set at four feet and the hips are only three feet wide I needed to make two bends in the legs. I used a 12 ton pipe bender for this.

Once I was satisfied with the bends I temporarily set the legs and hips in place. I was pretty happy with the fit.

Fiber-glassing the arms and chest plate started off as a procedure of measuring, mixing, daubing, brushing and applying. Over the next few hours this eroded into squirting, sloshing, smearing, swearing and shoving. Although Connie and I were very ‘done’ with the fiberglassing process at the end of the day, the pieces came out pretty well.


No comments:
Post a Comment